An introductory example (Knocker, Blaster) -Vol.2-
Category
others
Industry sector
None
Product used
None
Recently, we have many inquiry for the knocker and Blaster from many visitors.
So, while introducing some fitting (introduction) examples of these machines adopted in various places, it reports also about the situation of a fitting before / after
Dam sight
Site
Dam sight
Model
Direct blaster/EDB6-230
Specification
Diameter phi12mx height of 12m
Situation before adoption
In case the aggregate stored in the silo is discharged, depending on the situations (moisture, storage time, etc.) of aggregate, a blockade occurs within a silo. Discharge of concrete aggregate cannot be performed. Trouble occurs in concrete placing and, finally it becomes the delay of dam construction.
The present situation
The blockade in a silo was destroyed according to the blasting force of Blaster. Smooth discharge of aggregate is enabled and it contributes to planned ready-mixed-concrete manufacture.
Concrete precast factory/measuring instrument of cement
Site
Concrete precast factory/measuring instrument of cement
Model
Piston vibrator EPV18
Specification
A piston vibrator EPV type can do installation simply, if a channel steel is used. (Fixation is one bolt) An attachment position can also be installed in level and all the vertical 360-degree directions. It can carry out controllable of the vibration frequency by supply air.
Situation before adoption
The meter was generated by adhesion at the time of a rainy season, and the first-in first-out of a product did not go well, but was suffering troubles.
Situation before adoption
The meter was generated by adhesion at the time of a rainy season, and the first-in first-out of a product did not go well, but was suffering troubles.
The present situation
It succeeds in discharge of cement adhering to the surface of a wall of a meter. EPV of small size played an active part.