Vibrator basic knowledge
Why use vibrator?
It is to make beautiful concrete structure (product) with high intensity.
- 1, Liquefaction will raise concrete density,
- 2, Unnecessary mixing air will be removed,
- 3, Aggregate was distributed equally.
From our experience to make good concrete
- 1, Use the vibrator of the head same at least as the largest size of the aggregate.
- 2, The effective range can be considered to be 10 or less times of a vibrator head diameter (that is move the vibrator of diameter 50 mm diameters within 500mm range or less).
- 3, Apply vibrators at least 18 seconds per spot.
- 4, 10 - 20 seconds of initial vibration are the most effective in vibration time, and the rate of vibration transfer is fixed even more vibration is applied at the same place.
Concrete consolidation capability standard table.
Pitch vibration part diameter, concrete consolidation range
* Conditions of the above table: (Either in civil engineering works or construction, construction slumps also differ. With plain concrete, it shall consider as slump 8cm, and the concrete placement domain by substitution of vibrator shall not overlap)
| Frequency (Hz) |
Head Size (mm) |
Placing Range (Diameter/mm) |
Capacity (m3/hr) |
|
|---|---|---|---|---|
| HBM30ZX | 200 / 240 | 31 | 350 | 12 |
| HBM40ZX | 43 | 450 | 18 | |
| HBM50ZX | 52 | 600 | 24 | |
| HBM60ZX | 61 | 700 | 30 |
Concrete consolidation capability standard table.
- 1, Vibrator is inserted less than for every effective range.
- 2, A decrease of the concrete volume stops.
- 3, Paste comes up to a surface on the average.
- 4, It will be compaction completion if it seems that the right face was tinged with light.
- 5, It draws out slowly so that a hole may not remain.
- 6, Please take care also about the following three points

(
(

If insert vibrator 10 cm in lower concrete and re-vibrates the vibrator at a narrow interval when concrete is driven into the upper part and lower concrete is beginning to become hard a little, a very good result will be obtained.

In placing concrete mix to a slope and cone slope, surely begin an injection from a lower part, and it is begun giving vibration from the bottom.
Notice at the time of placing concrete.
- 1, Do not let a vibrator run long outside concrete, it will overheat
- 2, Do force or push a vibrator into concrete, it will not remain vertical and may get caught in the reinforcement
- 3, Please have spare vibrator.